How It Works

From first dimensions to a coordinated steel building package.

Our process keeps owners, contractors, engineers, and erectors aligned before fabrication begins.

1

Discovery

We review building use, site location, dimensions, clearances, doors, budget, schedule, finish expectations, and future expansion goals.

2

Preliminary Design

We develop a practical concept with frame type, bay spacing, roof and wall systems, framed openings, insulation, and major accessories.

3

Engineering Coordination

Project-specific loads, code criteria, structural framing, connection details, and anchor bolt requirements are coordinated.

4

Manufacturing

Primary framing, secondary members, panels, fasteners, trim, closures, and accessories are fabricated and organized for delivery.

5

Delivery & Staging

The building package ships to the site with drawings and organized bundles to support efficient unloading and staging.

6

Erection Support

The contractor assembles the steel frame, installs secondary framing, roof panels, wall panels, trim, doors, and accessories.

What makes the job smoother?

Early decisions reduce field questions. We recommend confirming building dimensions, code criteria, concrete schedule, anchor-bolt layout, door package, insulation system, and delivery access before manufacturing release.

Project location, use, width, length, eave height, roof slope, openings, insulation needs, preferred colors, and target delivery date.

Yes. Metal buildings can be configured with different frame systems, panel profiles, openings, accessories, insulation packages, and finish details.

IronSpan can coordinate with owners, general contractors, and erectors. The exact installation scope should be defined during contracting.